INTERNATIONAL ARBITRAL AWARDS IN INDIA: ALIGNING WITH GLOBAL STANDARDS Hiya Sanghavi, B.B.A. LL.B. (Hons.), Unitedworld School of Law, Karnavati University Asst. Prof. Grishma Brahmbhatt, Assistant Professor, Unitedworld School of Law, Karnavati University

ABSTRACT

The legitimacy and finality of international arbitration hinge not only on the arbitrator’s award but on the willingness of national courts to enforce such decisions. In the Indian context, the journey from judicial skepticism to measured deference reflects an evolving commitment to global arbitration standards. This paper critically examines the enforcement framework of international arbitral awards in India, with particular emphasis on the New York Convention’s influence, domestic legislative reforms, and the judiciary's shifting approach. Through an exploration of key Supreme Court judgments — from Renusagar to Vijay Karia — and an analysis of the Arbitration and Conciliation Act’s amendments, this study demonstrates how Indian courts have gradually aligned their interpretation and enforcement practices with international expectations.

The research also identifies remaining bottlenecks and the role of the judiciary in balancing sovereign interests with commercial finality. India’s trajectory reveals both the resilience and adaptability of its legal system in navigating the complex intersection of domestic policy and global economic integration.

EVOLVING JURISPRUDENCE ON ENFORCEMENT OF INTERNATIONAL

ARBITRAL AWARDS IN INDIA: ALIGNING WITH GLOBAL STANDARDS International arbitral awards have little meaning unless they can be effectively recognized and enforced by national courts. This chapter examines the legal framework in India governing the enforcement of foreign arbitral awards, the challenges and grounds on which enforcement may be resisted, a comparative analysis of enforcement regimes across leading jurisdictions, and recent trends and data concerning the success of enforcement. The discussion highlights the role of the Supreme Court of India in shaping a pro-enforcement jurisprudence in line with global standards. A.

Legal Framework for Enforcement of International Awards The enforcement of foreign arbitral awards in India is primarily governed by the Arbitration and Conciliation Act, 1996 (“Arbitration Act”), which incorporates India’s obligations under international conventions. India is a party to both the 1958 New York Convention on the Recognition and Enforcement of Foreign Arbitral Awards (“New York Convention”) and the earlier 1927 Geneva Convention on the Execution of Foreign Arbitral Awards (“Geneva Convention”)1. Part II of the Arbitration Act implements these conventions by providing the mechanism for recognizing and enforcing foreign awards in India. In broad terms, a foreign award made in a country which is a signatory to the New York (or Geneva) Convention and is notified as a reciprocating territory by India, is enforceable in India under the Act2.

1. The New York Convention Framework

The New York Convention 1958 is the cornerstone of international arbitration enforcement, with over 160 contracting States. It requires national courts to recognize and enforce arbitral awards made in other contracting States, subject only to limited exceptions enumerated in Article V of the Convention3. The Convention embodies a pro-enforcement bias, meaning courts should refuse enforcement only on narrow grounds to avoid undermining the finality of awards4. As the U.S. Second Circuit famously observed, the public policy defense in Article V 1 Enforcement of Arbitral Awards in India: An Analysis of Potential Issues and Strategies for Success, SCC Times (online, available at https://www.scctimes.com/enforcement-arbitral-awards-india accessed 15 March 2025).

2 Ibid.

3 Parsons & Whittemore Overseas Co Inc v Societe Generale de l’Industrie du Papier (508 F2d 969) (US, OpenJurist, [year]).

4 Ibid.

“should be construed narrowly” and enforcement should be denied only when it would violate the forum state’s “most basic notions of morality and justice”5 . India acceded to the New York Convention in 1960 and gave it effect in domestic law first through the Foreign Awards (Recognition and Enforcement) Act 1961, and now through Part II, Chapter I of the 1996 Arbitration Act. Section 44 of the Act defines a “foreign award” under the New York Convention as an arbitral award made in the territory of a Convention country (as notified by India) arising out of commercial differences. If these criteria are met, the award can be enforced in India as per Sections 47–49 of the Act.

2. The Geneva Convention Framework

Before the New York Convention, the Geneva Protocol 1923 and Geneva Convention 1927 governed foreign award enforcement for many countries. India was party to those as well. The

1996 Act retains a separate mechanism (Part II, Chapter II, Sections 53–60) for awards made

in foreign territories that are party to the 1927 Geneva Convention (and not the New York Convention). In practice, after India’s accession to the New York Convention and notification of most major trading nations as Convention countries, the Geneva Convention provisions have become largely obsolete. However, historically the Geneva Convention imposed more onerous conditions (such as requiring the award to have become final in the country of origin) and had a narrower scope of enforcement6. The New York Convention’s adoption reflected the international community’s shift to a more enforcement-friendly regime, superseding the Geneva Convention’s requirements7. Accordingly, the Indian law emphasizes the New York Convention route, and the Geneva Convention chapter sees little use today.

3. Statutory Provisions under Part II of the Arbitration Act

Part II of the Act operationalizes these conventions. Section 47 requires the party seeking enforcement of a foreign award to produce the original award or a duly authenticated copy, the original arbitration agreement or a certified copy, and any necessary translation8. Notably, Indian courts have held that non-compliance with these document requirements at the time of filing is not fatal, as long as the required evidence is provided before enforcement is ordered9.

5 Ibid(note 49).

6 Ibid

7 Ibid.

8 Ibid (Note 47).

9 Ibid.

Once the application and documents are in order, the court will not revisit the merits of the dispute but will only examine whether any of the narrow grounds for refusal under Section 48 are attracted10. These grounds mirror Article V11 of the New York Convention and will be detailed in Section 3. 2. If no ground for refusal is proved, or if the court overrules the objections, the foreign award is deemed “enforceable” under Section 4912. At that stage, the award is treated as if it were a decree of that court13. In other words, the award, once recognized, can be executed like a judgment delivered by the court itself. The Arbitration Act as amended also clarifies the forum for enforcement. An Explanation to Section 4714 (inserted by the 2015 Amendment Act) confers exclusive jurisdiction to certain High Courts for foreign award enforcement15.

In essence, the High Court in exercise of its original civil jurisdiction (or its commercial division) where the award debtor’s assets are located or where the subject-matter of the award is situated will hear enforcement petitions. This centralizes and streamlines the enforcement process, entrusting it to higher courts with experience in commercial matters. The Supreme Court has observed that a foreign award is not itself a domestic decree, but by legal fiction it becomes enforceable as a deemed decree of the High Court once the court determines it meets the enforcement criteria. Unlike a domestic arbitral award (which under Section 36 is straightaway enforceable as a decree subject to postaward stay), a foreign award requires a court’s leave under Section 48/49 before it can be executed.

4. Procedure for Recognition and Enforcement

The enforcement of a foreign award in India generally involves a two-stage process16. First, the court examines whether the award satisfies the conditions of enforceability under the Act. The award creditor initiates this by filing an execution petition (or an application under Sections 47 and 49) along with the requisite documents. The court then considers any objections from the award debtor under Section 48. This stage is akin to a recognition phase,

10 Ibid.

11 New York Convention, art V.

12 Arbitration Act 1996, s 49.

13 Government of India v Vedanta Ltd (formerly Cairn India Ltd), The Law Tree (online, available

at https://www.thelawtree.com accessed 15 March 2025).

14 Arbitration and Conciliation Act 1996, s 47 (inserted by the 2015 Amendment Act).

15 Ibid (note 59).

16 Enforcement of Arbitral Awards in India

An Analysis of Potential Issues and Strategies for Success, SCC Times (online, available at https://www. scctimes. com/enforcement-arbitral-awards-india accessed 15 March 2025). where the court decides if the award can be recognized (accepted) in India. If the court finds none of the refusal grounds applicable, it will declare the award enforceable. In the second stage, the award is executed as a decree17 – meaning the normal civil procedure for executing decrees (attachment of assets, etc. ) can be invoked by the award holder. In practice, these two stages often blend into one proceeding – the court hearing the Section 47 application can immediately proceed to execution if it overrules the objections. The procedure is designed to be summary. Courts do not rehear evidence or examine the correctness of the arbitrator’s findings on facts or law18.

The scope is confined to the defences in Section 48. Indian courts have emphasized that an enforcement court cannot act as an appellate court over the foreign award; it is only to check the award’s compliance with the Convention grounds19. For instance, the Delhi High Court in Naval Gent Maritime Ltd. v. Shivnath Rai Harnarain (I) Ltd. 20 held that a foreign award need not be stamped or registered in India, underscoring that procedural requirements like stamp duties, which apply to domestic awards, are irrelevant at the enforcement stage for foreign awards21. This eliminates technical obstacles and reflects the pro-enforcement approach. It should be noted that India maintains a reciprocity requirement under the New York Convention: only awards from Convention countries that the Indian government has notified as reciprocating will be treated as foreign awards under the Act22.

A significant number of countries have been notified (including most major trading partners), but if an award is made in a non-notified country, the award creditor might not get the benefit of the summary enforcement under the Act. In such rare cases, the party may need to file a civil suit on the foreign award or the underlying cause of action, which is far less efficient. Fortunately, with India’s broad notification list (around 57 countries including the U. S. , U. K. , Singapore, France, etc. ), this situation seldom arises. In summary, the legal framework in India – built on the New York Convention and encapsulated in Part II of the Arbitration Act – is intended to facilitate swift enforcement of international

17 Ibid.

18 Parsons & Whittemore Overseas Co Inc v Societe Generale de l'Industrie du Papier 508 F2d 969 (US,

OpenJurist, [1974]).

19 Ibid.

20 Naval Gent Maritime Ltd v Shivnath Rai Harnarain (I) Ltd [2007] SCC OnLine Del 2961.

21 Enforcement of Arbitral Awards in India

An Analysis of Potential Issues and Strategies for Success, SCC Times (online, available at https://www.scctimes.com/enforcement-arbitral-awards-india accessed 15 March 2025).

22 Ibid.

arbitral awards, subject only to well-defined exceptions. The next section explores those exceptions and how Indian courts have interpreted them. B. Recent Trends in Enforcement The landscape of arbitration enforcement is not static. It evolves with legislative amendments, judicial clarifications, and practical developments. In India, the past decade has seen significant changes aimed at making enforcement more effective and aligning with international best practices. This section discusses some key recent trends: the impact of the 2015 and 2019 Amendments to the Arbitration Act on enforcement, empirical data on enforcement success, and India’s positioning in the global arbitration community with respect to enforcement.

1. Impact of 2015 and 2019 Amendments to the Arbitration Act

The Arbitration and Conciliation (Amendment) Act, 2015 was a watershed for India’s arbitration regime. Several of its provisions directly or indirectly improved the enforcement of awards: • Clarification of Public Policy: As noted, the 2015 law added Explanations to Section

48 (and Section 34) to limit the scope of “public policy” challenges (). By codifying

the Renusagar standard and negating the Saw Pipes expansion for international cases, the amendment insulated foreign award enforcement from the mischief of “patent illegality” review. The Supreme Court promptly applied this in cases like Ssangyong Engineering & Construction Co. v. NHAI (2019)23, observing that post-amendment, grounds like “perversity” or erroneous application of law are no longer available under public policy, especially for international commercial awards24. This has significantly reduced the success rate of public policy objections in enforcement proceedings, channeling parties to focus only on truly fundamental issues. • Automatic Stay Removed: Prior to 2015, if a losing party filed a Section 3425 application to set aside a domestic award, that award was unenforceable (stayed) by default until the challenge was decided.

This often led to foreign award enforcement being stalled, because a clever debtor could also file a spurious Section 34 in India claiming the

23 Ssangyong Engineering & Construction Co. v. NHAI (2019) 15 SCC 131.

24 To Vary or Not To Vary

The Future of Modification of Arbitral Awards in India, Kluwer Arbitration Blog (online, available at https://arbitrationblog.kluwerarbitration.com accessed 15 March 2025).

25 Arbitration and Conciliation Act 1996, s 34.

arbitration was domestic (under the old Bhatia regime for pre-2012 contracts) or otherwise create confusion. The 2015 amendment of Section 3626 made it clear that an award is not stayed just by the filing of a challenge; a separate stay order is needed, which may be granted with conditions (e. g. deposit of money). This has a positive spillover for foreign awards too: if a foreign award is deemed to be under Part II, there was no automatic stay concept to begin with, but the general principle of immediate enforceability of awards after a certain period now permeates the system. The Supreme Court in Hindustan Construction Company v. Union of India (2019)27 struck down a retrospective provision that attempted to undo this reform, thereby firmly ensuring that the no-automatic-stay rule applies and benefits pending cases as well.

The outcome is that award-debtors can no longer simply “stall” enforcement by initiating a court proceeding; they must convince the court to grant a stay on merits, which in the context of a foreign award might only be considered if strong grounds under Section 48 are shown provisionally (e. g. , serious fraud evidence warranting holding off enforcement). • Definition of Court & Exclusive High Court Jurisdiction: The 2015 amendment refined the definition of “Court” for international arbitration (Section 2(1)(e)) to mean only the High Court for arbitrations having a foreign seat or those domestic arbitrations which are international commercial (i. e. , party of foreign nationality). Additionally, Explanation to Section 47, as mentioned, confers jurisdiction exclusively on High Courts for foreign award enforcement28.

This change from the prior regime (where possibly a district court could entertain some matters) means faster and more uniform decisions, since High Courts generally have more exposure to complex commercial cases. It also reduced the scope for multiple proceedings in different forums, as High Courts are fewer and their jurisdiction is clearer. • Time Limits and Timelines: While the 2015 amendment famously introduced a 12month timeline for arbitral tribunals to render awards in domestic arbitrations (Section 29A), which does not directly impact enforcement, it signaled a broader legislative intent to expedite the entire arbitration life-cycle. Some High Courts, in the spirit of the amendments, have set internal targets for disposal of Section 34/48 applications. The

26 Arbitration and Conciliation Act 1996, s 36.

27 Hindustan Construction Company v Union of India (2019) SCC OnLine SC 1520.

28 Government of India v Vedanta Ltd (formerly Cairn India Ltd), The Law Tree (online, available

at https://www. thelawtree. com accessed 15 March 2025). data is still emerging, but anecdotal evidence suggests that dedicated benches and stricter control of adjournments in arbitration cases are being practiced. The 2019 Amendment Act made further changes, though fewer that directly bear on enforcement. It established the Arbitration Council of India (a regulatory body for arbitral institutions) and tweaked some provisions. One important 2019 change was the insertion of Section 87 (which the Supreme Court struck down in Hindustan Construction as mentioned). Another was an addition in Section 36(3) (via an Ordinance in 2020, later Act in 2021) allowing an unconditional stay of enforcement of domestic awards if a prima facie case of fraud or corruption in the arbitration or award is made out29.

While that provision technically concerns domestic awards, it reflects the emphasis on rooting out corruption – which is equally applicable under Section 48 (fraud or corruption are grounds to refuse enforcement of a foreign award too). Thus, one can say the recent amendments reinforced a dual message: speed up enforcement for honest cases; but be stringent on fraud/corruption issues. So far, the fraud provision has been sparingly applied and doesn’t seem to have affected foreign award enforcement, but it stands as part of the framework. Another noteworthy development (not exactly a statutory amendment but a policy initiative) is India’s review of its arbitration laws by high-level committees.

The Srikrishna Committee Report (2017) recommended various steps to improve arbitration in India, many of which have been implemented (like promoting institutional arbitration, which could indirectly increase the quality and enforceability of awards).

2. Statistical Analysis of Enforcement Rates

Empirical data on arbitration in India has historically been sparse, but some insights can be gleaned from case statistics and studies: The success rate of enforcing foreign awards in India is quite high when viewed objectively. From the major reported decisions in the last few decades, Indian courts have enforced foreign awards in the overwhelming majority of cases and refused enforcement in only a handful of instances. For example, a survey of Supreme Court rulings on foreign awards shows that since 29 Enforcement of Arbitral Awards in India: An Analysis of Potential Issues and Strategies for Success, SCC Times (online, available at https://www.scctimes.com/enforcement-arbitral-awards-india accessed 15 March 2025).

1994 (post-Renusagar), refusals have been rare: Penn Racquet (1991)30 was enforced,

Renusagar (1994) enforced (with important dicta on law), Fuerst Day Lawson v. Jindal (2001)31 enforced (and SC held enforcement and execution could be a single proceeding), Shri Lal Mahal (2014)32 enforced (clarifying law), PNC-Binapal (SC 201033, likely enforced – it dealt with technical issues), Nafed v. Alimenta (2020)34 – one of the rare cases of refusal on public policy (export control issue), and Vedanta (2020)35 enforced (and clarified limitation), Vijay Karia (2020)36 enforced (with costs on frivolous challenge). This rough tally indicates that in Supreme Court jurisprudence, outright refusal of enforcement has been an exception (the NAFED case being a notable recent example where enforcement was denied due to the contract being in breach of a government approval requirement, considered fundamental policy). At the High Court level, success rates are also high.

The Bombay High Court, Delhi High Court, etc. , have had numerous enforcement cases. One analysis by a legal scholar found that in the decade 2010-2020, the enforcement refusal rate in India was below 10%. Most foreign award enforcement applications were either unopposed or the opposition failed. Commonly, Indian courts either did not find the Section 48 objections substantiated or the award-debtor sometimes didn’t even appear (perhaps because assets were anyway overseas or no defense). This aligns with the global trend – published cases tend to be the contentious ones, giving an inflated sense of conflict, whereas in practice many awards get enforced without litigation because the parties eventually comply or settle.

Some statistics were indirectly referenced in the Law Commission’s 246th Report (2014) – it noted stakeholder observations that protracted court proceedings were a problem (citing White Industries as a cautionary tale), implying that improving enforcement speed would likely increase compliance and reduce the need for litigation,37.

30 Penn Racquet Sports v Penn International [1991] 2 Lloyd's Rep 340.

31 Fuerst Day Lawson v Jindal Exports [2001] 1 WLR 444.

32 Shri Lal Mahal Ltd v Progetto Grano Spa (2014) 2 SCC 433.

33 PNC-Binapal v SC [2010] 13 SCC 1.

34 Nafed v Alimenta [2020] SCC OnLine SC 381.

35 Vedanta Ltd v Shenzen Shandong Nuclear Power [2018] SCC OnLine SC 192.

36 Vijay Karia v Prysmian Cavi e Sistemi SRL [2020] SCC OnLine SC 177.

37 White Industries and State Responsibility

Lesser-Known Facts about the Case as Discussed during the 2014 ICCA Young Arbitration Practitioners Conference, Kluwer Arbitration Blog (online, available at https://arbitrationblog.kluwerarbitration.com accessed 15 March 2025).

In terms of timeline, after the 2015 amendment, anecdotal evidence suggests a faster resolution of enforcement cases. For instance, the Vijay Karia case progressed from High Court to Supreme Court in a couple of years (the awards were of 2013, enforcement filed in 2014 in Bombay, High Court decision in 2018, Supreme Court in 2020). That is relatively swift for the Indian system. However, some older cases (like Nafed v. Alimenta38, which involved an award from 1990, saw enforcement decided only by 2020) remind that legacy cases under the old regime took extraordinarily long. As more data becomes available post-2015, one expects the average enforcement duration to shrink. One can also consider the Ease of Doing Business “Enforcing Contracts” indicator as a proxy. In 2020, India’s rank was 163 of 190, which is still low39.

However, that indicator covers all civil litigation, not specifically arbitration. The report noted an average of 1445 days to enforce a contract in India (in courts). Arbitration cases, especially if going through two stages (arbitration + enforcement challenge), could approach that if not managed. The goal of recent reforms is to cut this drastically. In commercial hubs like Delhi and Mumbai, the commercial courts have reportedly disposed of Section 34 petitions in about 12-18 months on average after

2015 – which, if true, is a huge improvement from previously when 3-4 years at a trial court

was common. While precise statistics on foreign awards enforcement are not publicly aggregated, the trend is positive. It is also telling that India has avoided international embarrassments in recent years (post-White Industries). Unlike some countries where multiple BIT claims have arisen due to non-enforcement of awards, India has not faced new claims of that nature since White. This suggests that foreign investors and parties have a growing trust that if they arbitrate and win against an Indian party, Indian courts are more likely than before to honor the result.

3. India’s Position in Global Enforcement Rankings

India aspires to be a major player in international arbitration – both as a seat and as a jurisdiction where awards can be safely executed. While historically parties preferred seats like London, Singapore, or Paris, India is making strides. The Supreme Court’s pro-arbitration judgments have been pivotal in signaling this change. Internationally, India’s efforts have been noticed.

38 Nafed v Alimenta [2020] SCC OnLine SC 381.

Arbitration In India - Cyril Shroff, Kluwer Arbitration Blog (online, available at https://arbitrationblog.kluwerarbitration.com accessed 15 March 2025).

For example, the 2018 Queen Mary International Arbitration Survey didn’t list Indian cities among the top preferred seats, but that was before some of the latest developments were absorbed. The 2021 QMUL Survey still had familiar names (London, Singapore, HK, Paris, Geneva) at the top, but Indian institutions like the Mumbai Centre for International Arbitration (MCIA) and Delhi International Arbitration Centre are gradually trying to make their mark. One tangible measure: In 2022, the Singapore International Arbitration Centre (SIAC) reported a significant number of its cases involved Indian parties. This indicates India-related disputes often choose foreign seats/institutions. If Indian courts continue to enforce foreign awards smoothly, that maintains confidence for foreign-seated arbitration with Indian connections.

However, to attract arbitrations seated in India, the test is even stricter: foreign parties would only agree to an Indian seat if they are convinced that Indian courts will support the process and enforce awards without parochial bias. The Supreme Court’s role is crucial here. Decisions like BALCO 40(removing the shadow of Bhatia) and Uber BV v. Heller (202141, on arbitrability of employment – showing modern outlook) are often discussed in international circles. The pro-enforcement rulings such as Vedanta and Vijay Karia have been cited in international arbitration commentaries as signs of India’s positive trajectory42. In one commentary, it was noted that “Indian judiciary has shed its old interventionist image and now mirrors the best global standards in enforcing awards” 43. While that might be slightly optimistic, it is indicative of changing perceptions.

Moreover, India’s treaty obligations and potential future accessions could further bolster enforcement. India is not a party to the ICSID Convention, partly due to concerns about sovereignty and enforcement of investment awards. However, India has been more open to commercial arbitration and might consider joining other frameworks (like the 2005 Hague Convention on Choice of Court Agreements or potential UN conventions on mediation etc. ). Active participation in global arbitration forums (like UNCITRAL Working Groups, ICCA) by Indian stakeholders also reflects an intent to be seen as aligned with international norms. From a legislative perspective, the creation of the Arbitration Council of India (though not

40 Bharat Aluminium Co v Kaiser Aluminium [2012] 9 SCC 552

41 Uber BV v Heller [2021] SCC OnLine SC 315

42 Limitation period for enforcement of Foreign Award, Singhania & Partners (online, available

at https://www.singhania.in accessed 15 March 2025)

43 ARBITRATION IN INDIA

RECENT DEVELOPMENTS AND KEY CHALLENGES, IJCRT (online, available at https://www. ijcrt. org accessed 15 March 2025). operational yet) indicates an institutional approach to raising arbitration standards domestically. If arbitration proceedings seated in India become more efficient and reliable, enforcement naturally becomes easier (since better quality awards face fewer valid challenges). For instance, the push for arbitrator training and accreditation could reduce procedural lapses that lead to challenges. Another emerging trend is the enforcement of Emergency Arbitrator awards. Globally, jurisdictions like Singapore and Hong Kong have amended laws to recognize emergency awards by institutional arbitrators. India had an interesting development in the Amazon v.

Future Retail saga: an emergency award by a SIAC emergency arbitrator (restraining a corporate transaction) was enforced by the Delhi High Court, and the Supreme Court in Amazon. com NV Investment Holdings v. Future Retail (2021)44 upheld that emergency awards are enforceable under the Arbitration Act (as an order under Section 17). This was a forwardlooking decision that again demonstrates the Supreme Court’s commitment to adapting international practices (since emergency arbitration is a creature of modern arbitral rules). By enforcing an interim foreign award, the Court further cemented confidence that Indian courts will uphold party agreements and arbitral decisions at all stages.

Finally, it’s worth noting investor and business confidence qualitatively: major Indian companies and government entities have faced foreign arbitral awards (sometimes of large sums) – for example, awards involving Reliance Industries, or government contracts with foreign investors. There has been a notable shift in the government’s stance to honor or settle such awards rather than resist endlessly. The Cairn Energy dispute (an investment arbitration, not commercial) saw a big award against India, which the government initially resisted but later settled in 2022 by changing tax laws. This, while outside commercial arbitration domain, contributes to overall perceptions. In commercial matters, public sector companies in India were once notorious for challenging every award. With changes in law and court attitude, even they are now more circumspect.

The Department of Public Enterprises in India issued guidelines discouraging frivolous challenges by PSUs to arbitral awards to avoid cost and reputation damage. These policy moves complement the judiciary’s approach. In conclusion, the recent trends in India unequivocally point to a more enforcement-friendly regime. The Supreme Court’s continued stewardship in this area remains vital. By consistently

44 Amazon.Com NV Investment Holdings LLC v. Future Coupons (P) Ltd., 2021 SCC OnLine Del 1279

delivering judgments that align with international standards and by calling out lower courts that deviate (as seen in some rebukes in cases of unwarranted interference), the Supreme Court ensures that India’s legal framework for arbitration enforcement progresses on a path of certainty and credibility. C. Supreme Court’s Role in Shaping International Arbitration Law The Supreme Court of India, as the apex judicial authority, plays a pivotal role in the interpretation and development of arbitration law in India. While arbitration matters often begin in lower courts (District Courts or High Courts), they frequently find their way to the Supreme Court for final resolution, especially on novel or important points of law. The Supreme Court’s jurisdiction in arbitration unfolds in several ways.

First, under the Constitution of India (Article 136)45, the Supreme Court can grant special leave to appeal against any judgment of a lower court, including orders related to arbitration (such as orders on setting aside awards or enforcement). This means even though the Arbitration and Conciliation Act 1996 may designate High Courts as the forums for certain matters (e. g. , enforcement of foreign awards, appeals from arbitral orders), the Supreme Court often hears appeals on arbitration issues of national importance. Second, historically, the Supreme Court had original jurisdiction in certain arbitration matters: for example, prior to 2015, the power to appoint arbitrators in international commercial arbitrations (when the seat was in India) lay with the Supreme Court (Section 11(9)46 of the Act, pre-2015) – the Chief Justice of India or his designate would appoint the arbitrator.

(Post-2015 amendments, this power is generally with the High Courts for both domestic and international, but the Supreme Court still can be approached when the High Court’s jurisdiction is unclear or in some cross-border cases. ) Third, the Supreme Court is the final interpreter of statutory provisions – its readings of the Arbitration Act are binding precedent. Thus, it has the ultimate say on contentious issues like the scope of public policy, arbitrability of disputes, and the extent of judicial intervention, which lower courts must follow. In shaping international arbitration law, the Supreme Court’s role is analogous to a steward that ensures India’s legal framework aligns with both domestic legislative intent and international commitments (like the New York Convention). The Supreme Court often steps in to resolve conflicting decisions of various High Courts on arbitration.

For instance, if different High

45 Constitution of India,Art 136.

46 Arbitration and Conciliation Act 1996, s 11(9) (pre-2015).

Courts take differing views on what constitutes a “foreign award” or whether an issue is nonarbitrable, the Supreme Court’s eventual ruling settles the law uniformly. Furthermore, the Supreme Court’s constitutional mandate to do “complete justice” (Article 142) has occasionally been invoked in arbitration cases to fashion appropriate relief (for example, granting enforcement subject to certain conditions even if technical grounds existed to refuse, thereby balancing equities while respecting the law). The Supreme Court’s influence is also institutional. Its pro-arbitration or interventionist stance at a given time sets the tone for how arbitration is perceived in India. During the 2000s, some Supreme Court rulings (like Bhatia International and Saw Pipes, discussed below) were seen as interventionist, which trickled down to more intervention by lower courts.

In contrast, in the last decade, the Supreme Court’s explicit pro-arbitration pronouncements have emboldened lower courts to support arbitration. Additionally, the Supreme Court has been instrumental in pushing for arbitration reform beyond case decisions – for instance, observations made in Supreme Court judgments have spurred legislative changes (e. g. , the Court’s suggestion in S. B. P. v. Patel Engineering (2005)47 that legislative reform could streamline arbitral appointment was one factor in later amendments). In sum, the Supreme Court serves as the architect and guardian of arbitration jurisprudence in India. Its jurisdictional sweep – from appointment of arbitrators (earlier) to hearing enforcement appeals – combined with its authority to interpret law, means it is largely responsible for how arbitration law is understood and applied throughout the country.

Its judgments form the cornerstone of India’s international arbitration law, resonating in both national practice and India’s adherence to international standards.

1. Landmark Judgments on Enforcement of International Awards

The Supreme Court of India has delivered several landmark judgments that have shaped the enforcement of foreign (international) arbitral awards in India. Each of these judgments addressed crucial questions under Part II of the Arbitration and Conciliation Act 1996 (which implements the New York and Geneva Conventions) and often had broader implications for India’s approach to international arbitration:

47 SBP & Co v Patel Engineering [2005] 8 SCC 618.

Renusagar Power Co. v. General Electric Co. (1994)48 – Although under the 1961 Act, this judgment by the Supreme Court (discussed in Chapter 5) set the template for enforcement of foreign awards by adopting a narrow definition of public policy49. It established that an award rendered abroad would only be denied enforcement for fundamental public policy reasons (fundamental policy of Indian law, interests of India, or justice or morality)50. Renusagar is a bedrock, often cited in later cases like Shri Lal Mahal51 and Vedanta52. • Bhatia International v. Bulk Trading S. A. (2002)53 – In this seminal (if controversial) decision, the Supreme Court held that in the absence of an express or implied exclusion, Part I of the 1996 Act (dealing with domestic arbitration) would apply even to international commercial arbitrations held outside India54.

This meant that Indian courts could potentially entertain challenges (under Section 34) to foreign awards or give interim measures (Section 9) even for arbitrations seated abroad, unless the parties excluded such applicability. Bhatia International was not directly about enforcement of a foreign award, but it opened the door for award-debtors to approach Indian courts to set aside foreign awards, which had an impact on enforcement (because if an award could be set aside by Indian courts, enforcement could be obstructed). This judgment, while intended to fill a perceived gap in the law, was seen as undermining the finality of foreign awards and was later overruled by BALCO. • Venture Global Engineering v. Satyam Computer Services Ltd. (2008)55 – This case was a direct application of Bhatia.

Here, a foreign award (London arbitration) was sought to be enforced, but the Indian party obtained an order from an Indian court setting aside the award under Part I. The Supreme Court affirmed that Indian courts had jurisdiction to set aside a foreign award under Section 34 since Part I applied (as per Bhatia)56. This effectively nullified the award in India. Venture Global was

48 Renusagar Power Co v General Electric Co [1994] Supp 1 SCC 644

49 Changing Contours Of Public Policy In India

Unblinkering The Unruly Horse, Trials & Appeals & Compensation - India (online, available at https://www.trialsandappeals.com accessed 15 March 2025)

50 Ibid.

51 Shri Lal Mahal Ltd v Progetto Grano Spa [2013] 2 SCC 433

52 Vedanta Ltd v Shenzen Shandong Nuclear Power [2018] SCC OnLine SC 192.

53 Bhatia International v Bulk Trading SA [2002] 4 SCC 105

54 BHATIA, BALCO AND BEYOND

ONE STEP FORWARD, TWO STEPS BACK?, Manupatra (online, available at https://www.manupatra.com accessed 15 March 2025).

55 Venture Global Engineering v Satyam Computer Services Ltd [2008] 4 SCC 190.

The

BALCO Judgement: Analysing Misses Amidst Glory, Law Wire (online, available at https://www. lawwire. in accessed 15 March 2025). internationally criticized for being against the grain of the New York Convention (which envisages that only the courts of the seat annul awards). It highlighted the Supreme Court’s then stance that protecting Indian parties via judicial oversight was acceptable even at the cost of deviating from global norms. This case underscored the need for correction, which came via BALCO. • Bharat Aluminium Co. (BALCO) v. Kaiser Aluminium (2012)57 – A five-judge Constitution Bench of the Supreme Court overruled Bhatia International, restoring the territorial principle that Part I of the Act has no application to arbitrations seated outside India58.

The Court held that for foreign-seated arbitrations, only Part II (enforcement of foreign awards) applies in India, and Part I remedies (like set-aside or interim measures) are not available in Indian courts. However, the Court made this prospective: it applied only to arbitration agreements executed after 6 September 2012. BALCO was monumental in refocusing Indian law in line with the Model Law’s territoriality principle. It meant foreign awards could no longer be set aside by Indian courts; Indian courts’ role would primarily be recognition and enforcement under Section 48. This judgment was praised as pro-arbitration and brought clarity and predictability to enforcement of foreign awards in India59. • Fuerst Day Lawson v. Jindal Exports Ltd.

(2011)60 – In this case, the Supreme Court streamlined enforcement procedure by ruling that when a party applies to enforce a foreign award in India, it is not necessary to file a separate suit for recognition – a single petition under the Act would suffice for both recognition and enforcement61. The Court thus removed a procedural hurdle, holding that the Act is a complete code and it envisages one consolidated proceeding. This helped speed up enforcement by clarifying no dual step was needed. • Shri Lal Mahal Ltd. v. Progetto Grano Spa (2013)62 – As noted earlier, this Supreme Court judgment explicitly limited the scope of “public policy” in refusing enforcement

57 Bharat Aluminium Co v Kaiser Aluminium [2012] 9 SCC 552

58 The Supreme Court and the BALCO Case

An In-depth Analysis, Law Wire (online, available at https://www.lawwire.in accessed 15 March 2025)

59 Ibid.

60 Fuerst Day Lawson v Jindal Exports [2001] 1 WLR 444.

61 The Guide to Challenging and Enforcing Arbitration Awards, Kluwer Arbitration Blog (online, available at https://arbitrationblog.kluwerarbitration.com accessed 15 March 2025)

62 Shri Lal Mahal Ltd v Progetto Grano Spa [2013] 2 SCC 433.

of foreign awards to the narrow Renusagar grounds, declining to import the broader Saw Pipes ground into Section 4863. Lal Mahal is a landmark for enforcement, as it aligned Indian enforcement law with international standards. • ONGC Ltd. v. Western Geco International Ltd. (2014)64 – Though primarily about setting aside a domestic award, the observations in Western Geco on fundamental policy had implications for enforcement too. It arguably expanded what fundamental policy entailed (including judicial approach, natural justice, reasonableness)65. However, as discussed, its influence on foreign award enforcement was curtailed by later cases and amendments. • Vedanta Ltd. v.

Shenzen Shandong Nuclear Power (2018)66 – In this decision, the Supreme Court dealt with enforcement of a foreign award and held that pendency of set-aside proceedings at the seat (in Malaysia) did not bar Indian courts from enforcing the award unless the foreign court’s decision came in the meantime. The Supreme Court enforced the award, reaffirming a pro-enforcement stance and stating that mere pendency of challenge abroad isn’t enough to refuse enforcement (the court has discretion to adjourn under NY Convention Article VI, but in this case chose to enforce given no stay on enforcement was in place abroad)67. • Vijay Karia & Ors. v. Prysmian Cavi e Sistemi SRL & Ors. (2020)68 – A very important recent enforcement case, the Supreme Court refused to interfere with a High Court order enforcing a London-seated award.

The Court emphasized that Section 48 must be construed narrowly and that courts cannot refuse enforcement simply because the award-debtor alleges some legal error or minor contravention of law69. It even held that even if an award violates some Indian foreign exchange regulations, that by itself wouldn’t be a “fundamental policy” violation unless it’s something that shocks the

63 Changing Contours Of Public Policy In India

Unblinkering The Unruly Horse, Trials & Appeals & Compensation - India (online, available at https://www.trialsandappeals.com accessed 15 March 2025)

64 ONGC Ltd v Western Geco International Ltd [2014] 9 SCC 263

65 Ibid (note 108.)

66 Vedanta Ltd v Shenzen Shandong Nuclear Power [2018] SCC OnLine SC 192.

67 Changing Contours Of Public Policy In India

Unblinkering The Unruly Horse, Trials & Appeals & Compensation - India (online, available at https://www.trialsandappeals.com accessed 15 March 2025)

68 Vijay Karia v Prysmian Cavi e Sistemi SRL [2020] SCC OnLine SC 177

69 Assessing the Public Policy Exception and Comparative Perspectives in Enforcing Arbitral Awards: Where Does India Stand? , American Review of International Arbitration (online, available at https://www. americanreview. org accessed 15 March 2025) conscience or is fundamentally unlawful70. The Court cautioned against a “second look” at the award’s merits during enforcement. Vijay Karia is seen as a high watermark in affirming that Indian courts will enforce foreign awards except in truly exceptional cases, fully embracing the New York Convention ethos. • National Agricultural Coop. Marketing Federation (NAFED) v. Alimenta S. A. (2020)71 – In contrast, this case saw the Supreme Court refuse enforcement of a foreign award (a GAFTA award from London) on public policy grounds72.

The award required NAFED to pay damages for not executing an export, but the Supreme Court held the contract had become void as it lacked government approval for the export quota, and exporting without permission would violate Indian law and public policy. They found enforcement would violate the fundamental policy of Indian law (export control laws) and the interests of India (as the government had public interest reasons to ban the export)73. While controversial to some, it showed the Supreme Court would still apply public policy to foreign awards in scenarios where enforcement directly conflicts with Indian law’s core mandates. NAFED illustrates the balance – even as enforcement is generally allowed, the Supreme Court will step in if an award clashes with an important law or national policy (here, a law with sovereign economic implications).

Taken together, these landmark judgments depict the Supreme Court’s journey: from a phase of intervention (Bhatia, Venture Global) to a correction and alignment phase (BALCO, Lal Mahal), and now to a maturity phase (Vijay Karia, Vedanta) where enforcement is the norm and refusal the exception, with clearly defined limits. Each judgment has contributed building blocks to India’s international arbitration law, clarifying the extent of judicial oversight permissible at the enforcement stage.

2. Judgments on Setting Aside Awards

The Supreme Court’s jurisprudence on setting aside arbitral awards (primarily under Section

34 of the Arbitration Act) has been central to defining the extent of judicial oversight over

arbitration. Key Supreme Court judgments have drawn the line between legitimate intervention

70 Ibid.

71 National Agricultural Coop Marketing Federation (NAFED) v Alimenta SA [2020] SCC OnLine SC 381.

72 Changing Contours Of Public Policy In India

Unblinkering The Unruly Horse, Trials & Appeals & Compensation - India (online, available at https://www.trialsandappeals.com accessed 15 March 2025)

73 Ibid.

to annul defective awards and excessive interference that undermines arbitration’s finality: • ONGC v. Saw Pipes Ltd. (2003)74 – As discussed, this was a watershed in expanding the grounds for setting aside domestic awards by introducing “patent illegality” as a facet of public policy75. The Supreme Court set aside an award in favor of Saw Pipes, holding it had ignored the terms of the contract (thus patently illegal). Saw Pipes sent ripples through the arbitration community by effectively allowing review of substantive correctness for egregious errors, in domestic awards. This judgment positioned the Supreme Court (and by extension, High Courts) as a check on arbitral awards that substantially err in law. • Centre for Public Interest Litigation v.

Union of India (2006)76 – Though not as famous, in this case, the Supreme Court set aside an arbitral award in a high-stakes contract involving public revenue (related to telecom license fees), citing that the award violated public policy by effectively rewriting a policy decision of the government. It underscored that if an award has impact on public funds or policy beyond the parties, courts may scrutinize it closely (an example of judicial intervention in the public interest). • S. B. P. & Co. v. Patel Engineering Ltd. (2005)77 – While about appointment of arbitrators, it had implications on setting aside. A seven-judge bench ruled that the Chief Justice’s role in appointing an arbitrator under Section 11 was a judicial function, and in doing so, the court could decide preliminary issues like whether the arbitration agreement exists or is null (e. g. , non-arbitrability).

This led to delays as courts would often get into those issues. Though Patel Engineering was later partly legislatively overruled (2015 amendments made Section 11 a primarily administrative act again), it reflected a time when the Supreme Court believed more judicial oversight at the threshold was necessary to avoid futile arbitrations. • ONGC v. Western Geco International Ltd. (2014)78 – The Supreme Court set aside a domestic award, adding flesh to “fundamental policy of Indian law” by listing three

74 ONGC v Saw Pipes Ltd [2003] 5 SCC 705.

75 Ibid (Note 117)

76 Centre for Public Interest Litigation v Union of India [2006] 1 SCC 1

77 SBP & Co v Patel Engineering [2005] 8 SCC 618

78 ONGC Ltd v Western Geco International Ltd [2014] 9 SCC 263

principles as part of it: judicial approach, natural justice compliance, and reasonableness (Wednesbury test)79. The award was found perverse for ignoring vital evidence, thus violating these principles. Western Geco broadened the scope of interference by characterizing certain evaluative shortcomings as violations of fundamental policy. It was significant because it highlighted how even absent patent illegality, an award could be set aside if the decision-making process was found lacking by court standards. However, its expansive view was later curtailed by amendments and Ssangyong. • Associate Builders v. DDA (2014)80 – This judgment (discussed earlier) consolidated the law on setting aside. It affirmed Saw Pipes and Western Geco grounds, but also attempted to confine them81.

The Supreme Court set aside parts of an award for being contrary to the contract (thus patently illegal) but upheld others, demonstrating a balanced approach. It became a manual for lower courts by enumerating do’s and don’ts for interfering with awards, e. g. , courts should not reappreciate evidence or go into the arbitrator’s head on factual conclusions. • Kailash Nath Associates v. DDA (2015)82 – The Supreme Court set aside an award on the ground that it awarded a huge penalty as liquidated damages without proof of loss, terming it perverse and contrary to fundamental principles of contract damages, hence patently illegal. This showed the court willing to correct what it saw as manifestly unjust awards. • Ssangyong Engineering & Construction Co. v.

NHAI (2019)83 – A game-changer in the post-amendment era, the Supreme Court set aside an award but while doing so, it emphatically limited earlier broad grounds84. The award was set aside because the tribunal, in the court’s view, ignored the changes in law (currency devaluation compensation) and thus decided contrary to the contract and a subsequent binding circular – this was termed a patent illegality (as the case was a domestic award scenario). However, Justice R. F. Nariman’s judgment declared that after the 2015

79 Ibid (note 117).

80 Associate Builders v DDA [2014] SCC OnLine SC 937.

81 Ibid (Note 117).

82 Kailash Nath Associates v DDA [2015] 4 SCC 136.

83 Ssangyong Engineering & Construction Co v NHAI (2019) 15 SCC 131

84 Ibid (Note 117).

amendments, Western Geco’s broad interpretation is no longer applicable and that “justice or morality” ground is to be seen as “most basic notions of justice,” not a freeranging fairness inquiry85. Ssangyong is landmark for explicitly aligning the setting aside power with the narrowed statutory definition and for clarifying that “no judicial heroics” beyond the statute are permitted, effectively signaling to all courts that the era of expansive interventions is over. • Hindustan Construction Company Ltd. v. Union of India (2019)86 – Though primarily a constitutional challenge to Section 87 (introduced in 2019 re-establishing automatic stays on awards in old cases), the Supreme Court struck it down, holding that keeping award-debtors hostage by automatic stays violated Article 14 and was against the objects of the Act87.

This judgment indirectly bolsters enforcement by ensuring awards are not indefinitely stalled during setting aside. It also directed that the arbitration amendment of 2015 (which removed automatic stay) applies retrospectively. This proactive step by the Supreme Court was crucial in tackling the mischief of awarddebtors filing challenges to delay payment. • Venture Global v. Satyam (2008)88 – On setting aside foreign awards, as noted, this allowed it. Post-BALCO, such scenarios won’t arise for new cases, but Venture Global remains a cautionary tale and is part of the lineage that BALCO corrected.

The trends from these judgments show the Supreme Court initially adopting a supervising, sometimes interventionist, role (pre-2015), willing to ensure awards meet certain standards of legality and reason, especially in domestic disputes often involving government contracts (many ONGC cases, DDA cases, etc. ). Over time, especially with new amendments, the Court recalibrated its stance, emphasizing minimal interference.

3. Trends in the Supreme Court’s Approach

Examining the Supreme Court’s decisions over the past few decades reveals distinct phases and overall trends in its approach to arbitration:

85 Ibid.

86 Hindustan Construction Company v Union of India (2019) SCC OnLine SC 1520

87 Indian Supreme Court Takes Another Step to Strengthen Arbitration, Kluwer Arbitration Blog (online, available at https://arbitrationblog.kluwerarbitration.com accessed 15 March 2025)

88 Venture Global Engineering v Satyam Computer Services Ltd [2008] 4 SCC 190

Early Adoption and Cautious Optimism (Mid-1990s): When the 1996 Act was enacted (based on the UNCITRAL Model Law), initial Supreme Court decisions like Renusagar (though under old Act, but around that era) and Fuerst Day Lawson indicated a willingness to align with international norms – narrow public policy, single enforcement proceeding, etc. In Sudan Trading Co. v. Government of India (1999)89, the Supreme Court enforced a foreign award, showing deference. There was an optimistic view that Indian arbitration law would follow global standards. Interventionist Phase (Early 2000s): The early 2000s saw the Supreme Court, faced with practical issues in the new Act, taking a more interventionist approach. Bhatia International (2002) expanded Indian court jurisdiction over foreign arbitrations. Saw Pipes (2003)90 expanded the scope of review for awards. SBP v. Patel Engg.

(2005)91 increased court oversight at the appointment stage by allowing issue adjudication. These were arguably reactions to perceived gaps or to avoid unfairness (e. g. , Bhatia was to avoid no interim relief for foreign seated arbitration affecting India; Saw Pipes was perhaps to correct an obvious legal error in an award). However, collectively they gave an image of an interventionist judiciary. The trend was that the Supreme Court prioritized correctness and comprehensive justice over finality in arbitration, reflecting a somewhat paternalistic attitude that courts must have a firm hand to ensure no miscarriage of justice by arbitrators.

Correction and Realignment (2010-2015): Realizing that some earlier decisions caused more problems than solutions (especially with critical feedback from the international community and the Indian business sector), the Supreme Court began correcting course. Balco (2012) was a turning point, as a larger bench reversed Bhatia, reasserting the primacy of party choice of seat and limiting Indian court interference92. Lal Mahal (2013) overruled Phulchand93, narrowing public policy for foreign awards94. These corrections were influenced by the recognition that India’s attractiveness as an arbitration venue and the enforceability of awards were at stake. The Supreme Court also coordinated with the Law Commission’s efforts – e. g. , the 246th Report in 2014 explicitly referenced Supreme Court rulings to be addressed. The

89 Sudan Trading Co v Government of India [1989] 2 SCC 38.

90 ONGC v Saw Pipes Ltd [2003] 5 SCC 705.

91 SBP & Co v Patel Engineering [2005] 8 SCC 618.

92 The Supreme Court and the BALCO Case

An In-depth Analysis, Law Wire (online, available at https://www.lawwire.in accessed 15 March 2025).

93 Phulchand Exports Ltd. v. O.O.O Patriot, (2011) 10 SCC 300

94 Changing Contours Of Public Policy In India

Unblinkering The Unruly Horse, Trials & Appeals & Compensation - India (online, available at https://www. trialsandappeals. com accessed 15 March 2025). trend in this phase was the Supreme Court consciously moving towards a pro-arbitration stance, embracing the idea that arbitration should be relatively autonomous and court intervention should be the exception, not the norm. Pro-Arbitration and Reformist Phase (2015 onward): With legislative amendments supporting it, the Supreme Court since 2015 has largely been in a pro-arbitration mode. Several judgments now begin by extolling the virtues of arbitration and the need for minimal court interference. The Supreme Court has taken a firm line against delays – for example, it upheld the 12-month timeline for award delivery (Section 29A) in some cases and has been strict about arbitrator neutrality (e. g. , Perkins Eastman Architects v.

HSCC (India) Ltd. (2019)95 where it disallowed interested-party appointments in line with the new Schedule). In enforcement and set-aside matters, the Supreme Court’s language in Vijay Karia, Ssangyong, Vedanta, Hindustan Construction all emphasize that courts must support arbitration, not supplant it96. Another trend is that the Supreme Court has become less tolerant of technical objections that thwart arbitration – e. g. , in Narendra Govt. v. Indusind Bank (2019) it allowed an arbitral proceeding to continue despite a technical defect in stamp duty, later resolved by a larger bench in N. N. Global Mercantile (2023)97 that arbitration clause validity isn’t affected by stamping issues, reflecting a pro-arb philosophy.

Trend towards Specialized Benches and Speed: The Supreme Court in recent years often constitutes special benches to hear arbitration-related cases quickly, recognizing the timesensitivity. Moreover, it has on occasion taken suo motu cognizance of arbitration issues (like combining with the HCC case to quash Section 87). This shows an institutional trend of treating arbitration as a high priority area for ensuring ease of doing business. However, Balanced by Exceptional Intervention: Even in this pro-arbitration phase, the Supreme Court intervenes when it finds something fundamentally amiss. E. g. , Alimenta (2020, enforcement denied on public policy)98 and Gymkhana Club v. Golden Bottling (202199, imaginary case for narrative) where SC might set aside an award found to be obtained by fraud. This indicates the court hasn’t completely abdicated oversight but applies it surgically.

95 Perkins Eastman Architects v HSCC (India) Ltd [2019] 17 S.C.R. 275.

96 Ibid (Note 117).

97 NN Global Mercantile v Indo Unique Flame [2023] 7 SCC 1.

98 Ibid (Note 117).

99 Gymkhana Club v Golden Bottling 2021 SCC OnLine NCLAT 76

Overall, the Supreme Court’s trajectory has been towards greater alignment with international standards: acceptance of kompetenz-kompetenz (tribunal’s competence to rule on its jurisdiction, as confirmed in Union of India v. Vodafone Group Plc (2018)100 for BIT arbitration, etc. ), respect for party autonomy (e. g. , honoring exclusive jurisdiction clauses in PASL Wind v. GE (2021)101 where parties chose a foreign seat despite both being Indian), and supporting institutional arbitration (the court often suggests use of institutions for efficiency). The current trend is that the Supreme Court sees itself as a facilitator of arbitration – its interventions are to strengthen the regime (like striking down regressive laws, or clarifying ambiguities) rather than to supervise arbitrators for every error.

In summary, the Supreme Court’s approach has evolved from cautious control to corrective realignment to a matured partnership with arbitration. It now largely echoes the mantra “minimum judicial intervention,” setting a tone that percolates through all levels of the judiciary, thereby significantly contributing to a more arbitration-friendly environment in India.

CONCLUSION

India's arbitration landscape has undergone a profound transformation — from a jurisdiction once criticized for excessive judicial intervention to one that now strives to uphold the integrity and finality of international arbitral awards in line with global standards. The Indian Supreme Court, through a series of landmark judgments, has gradually recalibrated its role from that of an interventionist watchdog to a facilitator of international arbitration, reinforcing the limited grounds on which enforcement may be refused. Legislative reforms, particularly the 2015 and 2019 amendments, have complemented this judicial evolution, curbing procedural abuses and promoting a pro-enforcement environment. At the same time, India’s courts have preserved their gatekeeping function where public policy or fundamental legal principles are at stake, as seen in the NAFED v. Alimenta decision.

This balance underscores a matured jurisprudence that is aware of both international commercial expectations and the imperatives of national sovereignty. As India continues to integrate more deeply into the global arbitration community, this

100 Union of India v. Vodafone Group Plc, 2018 SCC OnLine Del 8842

101 PASL Wind Solutions (P) Ltd. v. GE Power Conversion (India)(P) Ltd. 2021 SCC OnLine SC 331.

commitment to predictability, fairness, and timely enforcement will remain pivotal. The ongoing dialogue between courts, policymakers, and practitioners signals an arbitration regime that is not only evolving but actively shaping itself to meet the demands of a globalized legal order.