THE LEGAL ENFORCEABILITY OF PUBLIC-PRIVATE
PARTNERSHIPS IN THE INDIAN RAILWAYS
Muktaa Patil, O.P. Jindal Global University
ABSTRACT
This article examines the legal enforceability of Public-Private Partnerships (PPPs) within the Indian Railways sector, particularly about the extent to which inefficiencies in the execution and enforcement of PPP contracts impede the successful implementation of these collaborations between government and private entities. The paper delineates the various PPP models adopted by Indian Railways to address substantial investment disparities requisite for modernization and expansion, underscoring their inherent potential benefits. Alongside this, it also analyzes challenges presented in these partnerships, including lacklustre private participation, regulatory ambiguities, opaque clearance processes, and the conspicuous absence of robust dispute resolution mechanisms.
The research delves into the pertinent legal issues, emphasizing the lack of a uniform national legal framework and the inconsistencies emanating from inadequately drafted contracts. Through a comprehensive analysis of judicial precedents, the paper elucidates the potential for judicial intervention while simultaneously underscoring the fundamental imperative for standardized legal mechanisms. Ultimately, it posits prospective solutions, encompassing policy reforms, standardized contractual agreements, and innovative financing paradigms, to foster more successful and sustainable PPPs within the Indian Railways, thereby transforming them from prospective financial liabilities to potent catalysts for progress.
How do the Public-Private Partnerships (PPP) between the government and private entities impact the Indian railway sector due to inefficient execution and enforcement of the PPP contracts? Indian Railways has been the backbone of India's public transportation network for decades. The IR network is among the world's most complicated, most comprehensive, and continually increasing web networks. Indian Railways is one of the crucial ministries of the government of India, which has the mandate to provide economic and efficient rail transportation in India to achieve the twin goals of economic integration and regional development. Indian Railway is a monopoly which employs about 12.27 Lakh employees and owns about 65000 RKM track line. Every day IR operates about 13452 passenger trains. Organizationally, IR has been divided into
17 Zones and actively runs Mumbai, Kolkata, and Chennai Metro railways along with many
long-distance passenger trains. IR, with the help of the Act of Parliament, has the right of way rights and a massive land bank in different metro cities, which is yet to be tapped efficiently. To meet growing demand and modernize its infrastructure, IR requires an estimated ₹50 lakh crores for initiatives such as Dedicated Freight Corridors (DFCs), station redevelopment, and decongestion projects. While railways are cost-efficient—moving freight at ₹1. 41 per ton-km compared to ₹2. 58 per ton-km by road—they demand significant capital expenditure to facilitate a modal shift from road to rail. 1 What are Public-Private Partnerships? To bridge the investment gap, Indian Railways has adopted eight Public-Private Partnership (PPP) models. These include the SPV Model, where joint ventures are formed with IR holding 26% equity (e. g.
, RVNL, DFCCIL); the Non-Government Railway (NGR) model, where private entities build and operate last-mile connectivity (e. g. , Mundra Port); and the BOT (Build-Operate-Transfer) model, where private entities fund the entirety of railway corridors that often cover vast distances in a short period (e. g. , Kutch Railway). Other models include the User-Funded Model, with industries financing rail links in exchange for freight discounts (e. g. , NTPC-funded Hotgi-Kudgi line); the Annuity Model, which provides fixed payments to private developers (e. g. , Nagpur-Wardha third line); the Modified Design-Build approach for fast-track construction (e. g. , turnkey projects); allowance for 100% FDI (e. g.
, Alstom JV for 1 Karan Kumar, Public-Private Partnership in Indian Railways (CCS Working Paper No 182, Centre for Civil Society 2007–08) locomotives); and Private Train Operations, where private entities run passenger services (e. g. , Tejas Express). 2 The benefits of PPPs in Indian Railways are substantial. They bring in additional capital of ₹15,397 crore through PPPs compared to ₹4. 97 lakh crore via traditional procurement as was seen in the year 2014–19, introduce efficiency through private sector technology and management (e. g. , Alstom’s electric locomotives), and enable risk sharing by transferring construction and operational risks to private players. Key focus areas include stations (under IRSDC), freight corridors (DFCCIL), and rolling stock procurement and leasing (IRFC). 3 However, several challenges undermine the effectiveness of PPPs.
Private participation remains low, accounting for just 3% of total railway investment (2014–19), significantly lower than roads (37%). Regulatory issues persist, as IR continues to function as both operator and regulator, creating conflicts of interest. Delays in land acquisition, environmental clearances, and the absence of a dedicated dispute resolution mechanism hinder progress. 4 What are the problems that PPPs face? Railway public-private partnerships (PPPs) are meant to bring efficiency and investment into critical infrastructure, but too often, they end up as cautionary tales of financial losses and stalled projects. At the heart of the problem are poorly structured Model Concession Agreements (MCAs)—the contracts that define these partnerships.
Unlike standardized frameworks used in successful PPPs worldwide, India’s railway contracts are often drafted from scratch for each project, leading to inconsistency, ambiguity, and even outright exploitation. Without clear guidelines, risk allocation becomes a game of negotiation rather than fairness, leaving room for vested interests to tilt terms in their favor while the public bears the long-term costs. Furthermore, private investors face uncertainty due to a lack of traffic guarantees and the absence of exit mechanisms. 5 Comparative insights highlight why roads and power sectors have fared better.
Roads attracted ten times more PPP investments owing to transparent policies, standardized MCAs, and quicker 2 Neha Chhabra, 'Public Private Partnerships in Indian Railways' (2011) 11(2) Management Dynamics art 4 3 Sanjeet Sharma, 'Driving Growth and Connectivity: PPP's Impact on India's Railway Sector' (LinkedIn, 29 June 2023)
4 Sudheer Pal Singh, 'What Is Wrong with PPP in India?' Business Standard (New Delhi, 6 July 2013)
5 Comptroller and Auditor General of India, Report No 3 of 2014 – Performance Audit on Public Private Partnership Projects in Indian Railways (Government of India 2014) dispute resolution. The power sector enabled private entry through unbundling of generation, transmission, and distribution, whereas Indian Railways remains largely monopolistic. One of the most glaring flaws is the lopsided distribution of risk, particularly demand risk— the uncertainty over whether enough passengers will use the service to make the project viable. Private operators are often forced to absorb this entire burden, with no safeguards or revenue guarantees. This discourages serious, long-term investors and instead attracts speculative bidders who submit unrealistically optimistic projections, only to abandon projects when reality hits. The result?
Half-built stations, delayed lines, and costly renegotiations that drain public funds. 6 Even when contracts are well-intentioned, their weak dispute resolution mechanisms turn disagreements into financial sinkholes. Ambiguities around cost escalations, delays, and performance benchmarks mean that conflicts often spiral into prolonged arbitration or court battles. Years can pass before resolutions are reached, during which projects stall, costs balloon, and public trust erodes. But the problem runs far deeper than merely bad contracts. Execution failures plague even the best-laid plans. Delayed clearances, often due to land disputes, environmental approvals, or bureaucratic red tape, leave private partners stranded, paying interest on idle capital while waiting for the government to fulfill its commitments.
Lax monitoring allows delays and cost overruns to go unchecked until they become catastrophic. And the biggest hurdle lies within the fragmented decision making within the Indian Railways itself where different departments engineering, finance, operations operate in isolation, leading to duplicated efforts, sluggish approvals, and incoherent project management. 7 This invariably results in a system where PPPs become quagmires of inefficiency instead of becoming the fastrack to progress. The solution doesn’t lie in altering the contracts—it requires the creation of standardized risk-sharing frameworks, enforceable dispute resolution, streamlined approvals, and a cultural shift within Railways toward collaboration and accountability.
Without these reforms, railway PPPs will continue to hemorrhage money, 6 Comptroller and Auditor General of India, Report No 25 of 2022 – Compliance Audit on Union Government (Railways) for the Year Ended March 2021 (Government of India 2022)
7 Neha Chhabra, 'Public Private Partnerships in Indian Railways'
leaving passengers, taxpayers, and investors all shortchanged. 8 These inefficiencies inflate costs and reduce the attractiveness of rail PPPs as viable investments. In many cases, private partners cut corners to maintain margins, ultimately delivering substandard infrastructure or services. Corruption plays a significant role in exacerbating the financial losses associated with railway PPPs. Private organisations have to bid for railway contracts related to developing and building tracks, railway stations, and maintenance. Unfortunately, this follows a non-transparent bidding process, and in several cases, contracts are awarded to entities with political connections or insufficient technical credentials via bribery. This results in poorly executed projects and midcontract withdrawals, leaving the public sector to bear the financial and reputational damage.
Private entities also engage in gold-plating of projects. Essentially, this includes private contractors inflating project costs during planning phases, using insider influence to push through inflated estimates. This is followed by poor quality execution or partial delivery. Kickbacks and overbilling corruption seep into subcontracting and procurement, where vendors overbill or deliver subpar materials in collusion with officials. The cost is ultimately borne by the exchequer, while service quality remains unimproved. 9 Several factors contribute to the challenges faced in Public Private Partnership (PPP) contracts within Indian Railways (IR). Delays due to lengthy procedures in evolving workable Request for Quotation (RFQ), Request for Proposal (RFP), and contractual agreements are significant issues.
The changing stances of the Ministry of Railways (MoR) and the involvement of multiple stakeholders exacerbate these delays, deterring private parties. 10 Legal Issues with PPPs PPPs have emerged as a key player in infrastructure development, allowing both the private and public sector to pool together resources, money, technicians, etc to work on national development. The practical implementation of these partnerships however, requires a strong legal and institutional framework; PPPs in India are governed by a combination of sectorspecific laws, model concession agreements (MCAs), regulatory guidelines, and constitutional
8 Barnasree Chatterjee, 'Public-Private Partnership
Critical Evaluation of Its Economic Growth and Opportunities in Railway Sector in India' (2017) 6(4) International Journal of Science, Technology and Management 181
9 Neha Chhabra, 'Public Private Partnerships in Indian Railways'
10 Karan Kumar, Public-Private Partnership in Indian Railways
provisions. 11 The Public-Private Partnership Appraisal Committee (PPPAC) along with the PPP cells are institutional mechanisms that ensure the implementation of PPP projects using essential legal tools such as the Indian Contract Act, 1872, Land Acquisition Act, 2013, and sectoral laws like the Electricity Act, 2003. 12 India's PPP framework is built on the National PPP Policy and MCAs, which work together to address funding-related issues, risk management, and compliance with legal and ethical standards. However, the legal framework for PPPs frequently faces obstacles, the major one being the absence of consistency in governing rules and regulations between the state or states and the private sector.
Even if the Indian Contract Act (1872) and sector-specific laws, in this case, railway laws, provide a foundation, the lack of a uniform national legislation to regulate PPPs results in inconsistencies that spiral into jurisdictional conflicts and procedural ambiguities. 13 PPP contracts are long-term arrangements that have to be frequently renegotiated due to dynamic political and economic circumstances. However, numerous conflicts and stopped projects are caused by inadequate enforcement mechanisms and a lack of standardized contractual clauses. Another significant obstacle is acquiring land. The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation, and Resettlement Act, 2013 was passed, yet land-related conflicts are still common. These disagreements discourage the private sector from participating in projects by raising costs and delaying schedules.
The lack of efficient dispute settlement procedures. Delays in settlement frequently irritate project stakeholders, despite the Arbitration and Conciliation Act of 1996 providing a framework for arbitration. Many judicial and arbitral organizations lack sector-specific competence, which exacerbates this problem. In the case of Kusumam Hotels (P) Ltd. v. Kerala State Electricity Board14 the Supreme Court of India remarked that "in order to keep the faith of the people, the Government or its instrumentality should abide by their commitments". Unfortunately due to poorly drafted arguments this does not happen. The further underlying issue, that was brought to light in 11Nandita Veeresh Mamani and Gopi Ranga Nath V, 'Governance Frameworks and Legal Challenges in Infrastructure PPPs in India' (2025) 5(2) Indian Journal of Integrated Research in Law 144
12 Nandita Veeresh Mamani and Gopi Ranga Nath V, 'Governance Frameworks and Legal Challenges in
Infrastructure PPPs in India' (2025) 5(2) Indian Journal of Integrated Research in Law 144
13 Temulin Batjargal and Mengzhong Zhang, 'Review of Key Challenges in Public-Private Partnership
Implementation' (2021) 5(2) Journal of Infrastructure, Policy and Development 1378
14 Bharat Sanchar Nigam Ltd v BPL Mobile Cellular Ltd (2008) SC
Arshiya Rail Infrastructure Ltd. & KRIBHCO Infrastructure Ltd. v. Ministry of Railways,15 was the allegation that railway entities had abused their dominance by preventing and prohibiting the transportation of four essential commodities; ores, minerals, coal and coke and had also arbitrarily increased the haulage and stabling charges of the same. The verdict found tha Railways was not the dominating force and consequently no abuse of said dominance was discovered. These allegations, did nevertheless, raise concerns on the policy design used to incentivise private participation. With the assistance of judicial precedents, PPPs can be regulated but the existing void can't get filled completely. Therefore, the requirement is to enact a legislative framework such that the contracts can be effective and complete at the initial stage which will be essential to avoid future complications.
16 Enforceability of the contract is another critical concern, as has been discussed, due to the lack of a uniform legal mechanism as IR lacks experience in ensuring the discipline of private players in achieving the desired objectives. This can lead to uncertainty and reluctance from the private sector, creating a vicious cycle of mistrust that leads to backlogs in actual tangible work being done. The potential for misinterpretations and misunderstandings necessitates the development of proper documentation and well-written contracts to establish a precise policy and regulatory framework between IR and private parties. However, contracts are sometimes not ready until long after legal arrangements with private parties are made17. Judicial Interventions and Precedents Delhi Airport Metro Express Pvt. Ltd. v.
Delhi Metro Rail Corporation Ltd18 A concession agreement was made between the government-owned Delhi Metro Rail Corporation Ltd. (DMRC) and Delhi Airport Metro Express Pvt. Ltd. (DAMEPL), a Reliance Infrastructure division, for planning, building, running, and upkeep of the Airport Metro Line in Delhi using a PPP model. The main question was whether the public partner, Delhi Metro Rail Corporation Ltd. (DMRC), had violated the concession agreement by neglecting to provide a civil structure free of defects,
15 Reliance Energy Ltd v Maharashtra State Road Development Corporation Ltd (2007) SC
16 Akshay Anurag, 'Public-Private Partnership in Indian Railways
An Eye on Existing Legal Mechanism' (IJPIEL, 13 March 2021) 17K Sitharamaraju and others, Public-Private Partnership (PPP) in Indian Railways: Models, Framework, and Policies (Working Paper No 2020-12-05, Indian Institute of Management Ahmedabad, December 2020)
18 Centre for Public Interest Litigation v Union of India (2010) SC
compromising the PPP model's core risk-sharing principles. The Supreme Court of India established a precedent for upholding private party autonomy in PPPs by ruling that contractual provisions shall be enforced unless they conflict with public policy. Bangalore International Airport Limited v. Karnataka State Industrial Investment and Development Corporation19 The Kempegowda International Airport in Bengaluru was developed, run, and managed by Bangalore International Airport Limited (BIAL), a PPP organization. The Karnataka State Industrial Investment and Development Corporation (KSIIDC) and other government and business organizations were among the players in the project. The main concern was whether BIAL, a PPP organization overseeing public funds and investments, followed the rules of accountability, transparency, and equity in its actions and choices.
The Karnataka High Court underlined that PPP organizations in charge of public resources must maintain decision-making processes' transparency and be held to higher levels of responsibility and further held that the choices involving public funds had to be in line with the expectations of stakeholders and the general public. It ordered BIAL to reply to KSIIDC's concerns and guarantee adherence to governance standards. Narmada Bachao Andolan v. Union of India20 The Sardar Sarovar Dam project, carried out under a PPP model, encountered difficulties concerning environmental issues, displaced people, and rehabilitating those impacted. The initiative, according to activists, broke human rights and environmental laws. The issue that arose was whether the PPP project balanced development goals with environmental sustainability and social justice.
In its ruling, the Supreme Court emphasized the necessity of balancing public and private 19 Bangalore International Airport Ltd v Karnataka Information Commission (Karnataka HC, 9 February 2010) 20Delhi International Airport (P) Ltd v Union of India (2011) SC interests in PPPs by permitting the project to move forward while requiring strict adherence to environmental protections and appropriate rehabilitation measures. The rationale behind citing these judgements, is to demonstrate that these Public Private partnerships are not impossible to carry out. The issue in these partnership contracts lies in the lack of a standardised mechanism that can be used to enforce them. The contracts are largely based on the goodwill of parties, with no regulatory bodies, or dispute mechanisms, or mediators who exist, who can solve the issues as and when they arise.
In certain cases, even the seat of arbitration is unclear in these contracts, leaving both parties but especially the government sector vulnerable to continued exploitation. Potential Solutions The need for a more flexible approach, beyond just a political language of PPP, is essential, including creating an organization that is responsive to stakeholders, customers, and partners
8. Organizational restructuring and the separation of infrastructure from operations can
improve efficiency and attract private investment. Clear goal clarity, risk sharing, decisionmaking autonomy, partner's interest, equity leverage, transaction costs, project structuring quality, and transparency for contestability are crucial attributes for PPP success. Addressing these issues is vital for fostering successful and sustainable PPP contracts in Indian Railways. One of the significant drawbacks of Public Private Partnership (PPP) contracts in Indian Railways (IR) is the potential for delays due to lengthy procedures. Evolving Request for Quotation (RFQ) and Request for Proposal (RFP) agreements, along with the involvement of multiple stakeholders and changing stances of the Ministry of Railways (MoR), can cause considerable delays between project conceptualization and execution. This acts as a major deterrent for private parties who may be potential investors.
Several recommendations have been proposed to improve PPP outcomes. Policy reforms should unbundle IR’s roles as operator and regulator, and MCAs should be standardized for different asset classes. To incentivize participation, the government can offer tax breaks, viability gap funding (VGF), and traffic guarantees, alongside establishing a railway tariff authority to ensure fair access charges. Streamlining processes like land acquisition and clearance approvals and creating a dedicated PPP monitoring cell can further reduce delays. Innovative financing solutions, such as introducing INVITs/REITs for investor exits and leveraging multilateral agencies like the World Bank and JICA, can also bolster investment, particularly in DFCs. 21 Conclusion PPPs have emerged as essential for infrastructure development, in the Indian context, especially in the past 15 years.
However, the success of these partnerships relies heavily on a sound, sturdy regulatory framework that, in equal measures, prioritizes the interests of both the public and private sector. To fulfil the same goal, India has made a significant amount of progress towards creating a formal governance system for PPPs that includes institutional procedures, legislative actions and policy directives. Despite this however, ambiguities regarding regulations, disagreements on contracts, worries about risk distribution and the viability of projects still pose major obstacles. The confidence that investors have in a project and the success of the same are impacted by these inefficiencies and long drawn litigations, that are the result of a lacking PPP statute(s) as well as missing sector specific legal discrepancies.
22 The Public Sector Undertaking mindset within IR, characterized by a lack of interest from railway officials due to concerns about job security, can also impede successful PPP implementation. Additionally, poorly prepared feasibility reports can fail to present projects attractively, discouraging private sector participation. The lack of clarity in risk sharing and decision-making autonomy can also lead to conflicts and inefficiencies, ultimately undermining the success of PPP ventures. Addressing these drawbacks through streamlined processes, robust contract enforcement, and a clear vision is essential for realizing the full potential of PPPs in the Indian Railways. Meaningful reform of railway PPPs requires standardized agreements with consistent, fair risk allocation.
The 80% revenue guarantee in the BOT model provides a starting point but could be refined to ensure that guarantees reflect realistic projections subjected to independent validation rather than overly optimistic scenarios designed to win bids. 23 A sliding scale approach to risk-sharing, where protection levels adjust based on project
21 Barnasree Chatterjee, 'Public-Private Partnership
Critical Evaluation of Its Economic Growth and Opportunities in Railway Sector in India'
22 Nandita Veeresh Mamani and Gopi Ranga Nath V, 'Governance Frameworks and Legal Challenges in
Infrastructure PPPs in India' 23 Manoj Kumar Dubey, Innovative Methods for Public-Private Partnership in Indian Railways (Ministry of Railways, Government of India) maturity and performance history, could balance the need for investor security with incentives for efficient operation. As projects demonstrate performance, guarantee levels could gradually reduce, transferring more risk to operators who have proven their capability and market understanding. For demand risk specifically, contracts could include "regulatory asset base" approaches where investment recovery is guaranteed while operational returns vary with performance. This would protect basic investment while maintaining incentives for service quality and traffic growth, creating a more balanced partnership approach.