STATE OF MAHARASHTRA v. ABRAR AHMED MOHD. YAKUB SIDDIKI AND ANR.

Bench: HON'BLE SMT. JUSTICE S.S. JADHAV,HON'BLE SHRI JUSTICE N. J. JAMADAR

Case summary

STATE OF MAHARASHTRA v. ABRAR AHMED MOHD. YAKUB SIDDIKI AND ANR. Bombay High Court judgment dated 2020-11-05. Read the judgment and case details on LawSphereX.

Judgment text

Santosh IN THE HIGH COURT OF JUDICATURE AT BOMBAY CRIMINAL APPELLATE JURISDICTION CRIMINAL APPEAL NO. 302 OF 2001 The State of Maharashtra ... Appellant (Ori. Complainant) Versus 1. Abrar Ahmed Mohd. Yakub Siddiki Age 32 yrs. 2. Kausar Parvin Nadim Ahmed Siddiki Age 24 yrs. 3. Sadiyabano Abrar Ahmed Siddiki Age 25 yrs. …Respondents Ms. P. P. Shinde, APP for the State/Appellant. None for the Respondents. CORAM: SMT. SADHANA S. JADHAV & N. J. JAMADAR, JJ. th RESERVED ON : 27 October, 2020 th PRONOUNCED ON: 5 November, 2020 JUDGMENT : (Per: N. J. Jamadar, J. ) 1. This appeal is directed against the judgment and order in th RCC No. 71 of 2000, dated 26 December, 2000, passed by the rd Judicial Magistrate First Class, 3 Court, Malegaon, whereby the accused – respondents herein came to be acquitted of the offences punishable under Sections 39 and 44 of the Indian Electricity Act, 1910. 2.

Shorn of superfuities, the background facts leading to this appeal can be stated as under: 1/7 th (a) On 7 March, 2000, Mr. Shivaji Haribhau Chaphekarande, the then Deputy Engineer, Maharashtra State Electricity Board (“MSEB”) led a fying squad to inspect the electrical installations at Zamzam Ice Factory situated at Imdad Nagar, Malegaon. Electricity was being supplied through two electric meters to the said factory. Electric meter bearing No. 065510469679 stood in the name of Kausar Parvin Nadim Ahmed Siddiki – accused no. 2. The other meter bearing No. 065510461902 stood in the name of Sadiyabano Abrar Ahmed Siddiki – accused no. 3. The electric meters were inspected in the presence of Abrar Ahmed Mohd. Yakub Siddiki – accused no. 1. The sanctioned load for each of the consumer was 30 HP. It transpired that ‘R’ phase of the meter was rotating. However, ‘Y’ and ‘B’ phases were not working. The meters were recording only 1/3 of the units of energy actually consumed.

The meters were sealed by affiing labels of the fying squad. A spot inspection report (Eihibit-19) was prepared. (b) On the neit day, the members of the fying squad again visited Zamzam factory and inspected the electric meters in the presence of Mr. Shrikrishna Navlakhe, Jurisdictional Junior Engineer, MSEB. On removal of the terminal of electric meter it was revealed that insulation sleaves 2/7 were provided to CT wires of ‘Y’ and ‘B’ phase. Resultantly, ‘Y’ and ‘B’ phases were not working. A joint inspection report (Eihibit-20) came to be prepared. Panchnama was also drawn. The inspection thus revealed that there was dishonest abstraction of 1,22,270 units of electricity, worth Rs. 6,30,530/-. Thus a report was lodged at Ayeshanagar Police Station against the accused leading to registration of crime vide CR No. 0014 of 2000 for the offences punishable under Sections 39 and 44 of the Indian Electricity Act, 1910.

After completion of investigation charge-sheet was lodged in the Court of the jurisdictional Magistrate. (c) At the trial, the prosecution eiamined seven witnesses including Shivaji Haribhau Chaphekarande (PW-2), Dinakar Shewale (PW-3); the members of the fying squad, Dipak Joshi (PW-4), Shrikrishna Navlakhe (PW-5), Jagannath Pawar (PW-6), the local MSEB Offcers/offcials, and Abdul Gaffar Sardar Sheikh (PW-7), the Investigating Offcer. (d) After appraisal of the evidence and material on record the learned Magistrate was persuaded to acquit the respondents holding, inter alia, that the prosecution failed to establish that the accused used any artifcial means to abstract 3/7 electricity. Nor there was any proof of tampering with the electric meters. Being aggrieved, the State is in appeal. 3. We have heard Ms. P. P. Shinde, the learned APP for the State/appellant. We have also perused the material on record. 4. Ms.

Shinde submitted that the learned Magistrate did not properly appreciate the overwhelming evidence led by the prosecution in support of the charge. The evidence of Mr. Shivaji Chaphekarande (PW-2) and his assistant Mr. Dinakar Shevale (PW-3), coupled with the contemporaneous record in the nature th of the inspection report (Eihibit-19) dated 7 March, 2000 and th joint inspection report (Eihibit-20) dated 8 March, 2000, clearly established that the accused had resorted to dishonest abstraction of electricity by employing artifcial means and tampering with the electric meters. Nothing could be brought out in their cross-eiamination to demonstrate that they were inimically disposed towards the accused. Thus their testimony could not have been disbelieved, urged Ms. Shinde. 5.

Often dishonest abstraction of electricity, by its very nature, rests on the proof of tampering with electric meter and/ or use of artifcial means so as to record less consumption of the units than the actual consumption. Various devices are employed to bring about the end result of recording less 4/7 consumption of electricity. Section 39 of the Act thus incorporates a presumption that if it is proved that any artifcial means or means not authorized by the licensee eiist for the abstraction, consumption or use of energy by the consumer, it shall be presumed, until the contrary is proved, that such abstraction, consumption or use of energy has been dishonestly caused by such consumer. Proof of eiistence of artifcial means and/or tampering with meter, thus assumes signifcance. 6. On perusal of the evidence of Mr. Shivaji Chaphekarande (PW-2) and Mr. Dinkar Shevale (PW-3) it becomes evident that th the frst visit to the said premises was on 7 March, 2000.

The witnesses claimed to have noticed irregularity. Thus, the meters were sealed. Thy again visited the said premises accompanied by the local MSEB offcers/offcials. On the second visit, the witnesses claimed to have noticed that the insulation sleaves were pasted on the CT wires. 7. In the backdrop of this nature of the evidence, the primary question which comes to the fore is the sanctity of the electric meters. The witnesses conceded in the cross-eiamination that, th on 7 March, 2000, they found that the seals on those electric meters were intact. This admission singularly dismantles the prosecution case that the electric meters were tampered with. 5/7 Moreover, if the seals were intact, and yet the members of the fying squad suspected that there was dishonest abstraction of electricity, there was no reason for not removing the th terminal cover on 7 March, 2000 itself to ascertain the possible cause of recording low consumption, as suspected.

On the contrary, the witnesses claimed that the meters were sealed by affiing their seals and on the neit visit the meters were again inspected and at that time insulation sleaves were noticed. The said course of action, in our view, robs the element of spontaneity and leaves the door ajar for the allegation that the electric meter, seals of which were found to be intact, were tampered with in the frst visit and on the second visit the alleged irregularities were pointed out. 8. There is another factor which is of material signifcance. Mr. Shivaji Chaphekarande (PW-2) and Mr. Dinkar Shevale (PW- 3) conceded that the insulation sleaves are used as anti-shock or anti-current devices. There was no material to show that those insulation sleaves were not provided by the MSEB to the consumer while installing the electric meters.

If the insulation sleaves are provided as anti-shock or anti-current devices, in standard installations, then independent positive evidence was required to show that, in the given case, the insulation sleaves were not provided by the MSEB and they were designedly used 6/7 by the consumers for the purpose of dishonest abstraction of electricity. 9. In addition, we fnd that Mr. Shivaji Chaphekarande (PW-2) and Mr. Dinkar Shevale (PW-3) have substantially improved their testimony. Their evidence bristles with omissions and improvements on crucial aspects. 10. In the circumstances, in our view, the learned Magistrate was justifed in returning the fnding of not guilty on the premise that the prosecution did not succeed in establishing that either the electric meters were tampered with or the accused had used artifcial means to dishonestly abstract the electricity. 11.

As the view taken by the learned Magistrate is based on evidence and cannot be said to be the one which is unreasonable or impossible, we do not fnd any substantial or compelling reason to interfere with the order of acquittal. The appeal thus deserves to be dismissed. 12. Hence, the following order: : O r d e r : The appeal stands dismissed. Shraddha K. Talekar [N. J. JAMADAR, J. ] [SMT. SADHANA S. JADHAV J. ] Digitally signed by Shraddha K. Talekar Date: 2020. 11. 05 7/7 17:24:25 +0530